Topic starter
Alignment of two "A" frame after fabrication. Specs. - height 10 ft wide 10 ft. Pipe 3 inch diameter schedule 40 B.I.
Installation of temporary wooden frame then alignment with level bar
Measurement of wideness from top to bottom between two legs must be equal. Use "ton ton or plumb bob" for vertical alignment.
Spot weld parts. Measure several times before full weld.
Posted : 26/05/2016 10:07 am
taas nito bro ha. sarang pang unload ng tonetonelada na bakal hehe
Posted : 03/08/2016 9:29 am
Topic starter
Yes bro porpose ko kasi makapasok ang cab ng forward or ten wheeler truck.
Posted : 04/08/2016 8:20 am