Forum

Pop up Cabinet buil...
 
Share:
Notifications
Clear all

Pop up Cabinet build...

55 Posts
10 Users
0 Reactions
243 Views
jarod
(@jarod)
Posts: 1222
Noble Member
 

Re: Pop up Cabinet build...

I cut some materials for edge bands, since I want them to be bigger than store bought ones. got a new toy in the shop (will post pictures bukas) and cut the miters on it.

Timber, How are these fastened? Glued and nailed butt joints?

For more of the latest tools, deals and tips - click HERE

 
Posted : 15/09/2010 12:14 pm
timber715
(@timber715)
Posts: 5424
Member
Topic starter
 

Re: Pop up Cabinet build...

Timber, How are these fastened? Glued and nailed butt joints?

mitered edges, and yes, glued, shot with 18ga. nails to hold them in place and clamped. since these are side grain to side grain, the adhesion is more than sufficient.


click my signature and it will take you there........

 
Posted : 16/09/2010 12:19 am
timber715
(@timber715)
Posts: 5424
Member
Topic starter
 

Re: Pop up Cabinet build...

got the base trimmed to size added the edge bands, which I cut on the Bosch GCM 10M...

the Bosch CMS came with its own gravity rise stand (will write a review soon).

later today I added the edge bands on the short ends.

I do clamp them a bit tight...


click my signature and it will take you there........

 
Posted : 16/09/2010 12:30 am
timber715
(@timber715)
Posts: 5424
Member
Topic starter
 

Re: Pop up Cabinet build...

got the sides cut to dimensions and ripped some edge band materials. I am leaning toward a face frame design instead of just edge-banding the sides.

help arrived again in time to sand the base and sides smooth.


the center shelf is cut to size and made spacers to ensure alignment when installation comes.

the sides are not glued yet, still at dry fitting mode...


click my signature and it will take you there........

 
Posted : 16/09/2010 11:27 pm
(@jonathanscruz68)
Posts: 1492
Noble Member
 

Re: Pop up Cabinet build...

yap mas my body ang face framing than edge banding,how are you going to fasten the frame?

 
Posted : 17/09/2010 5:28 am
timber715
(@timber715)
Posts: 5424
Member
Topic starter
 

Re: Pop up Cabinet build...

applied stain and sealer on the parts individually.

Golden seems to be very strict inspecting every single joint.

while everything is drying, we started to cut the recess for the legs.


click my signature and it will take you there........

 
Posted : 18/09/2010 12:35 am
timber715
(@timber715)
Posts: 5424
Member
Topic starter
 

Re: Pop up Cabinet build...

strict talaga...

but he can't complain with joints like these...

more to come next week, rest time on weekends 🙂


click my signature and it will take you there........

 
Posted : 18/09/2010 12:36 am
timber715
(@timber715)
Posts: 5424
Member
Topic starter
 

Re: Pop up Cabinet build...

I have made some progress in the pop up table today, I started by gluing the sides in place na. checked for squareness all around.

on top is the top material already in a mock up position. the back cover for the center speaker portion is still not stained.


click my signature and it will take you there........

 
Posted : 21/09/2010 12:20 am
timber715
(@timber715)
Posts: 5424
Member
Topic starter
 

Re: Pop up Cabinet build...

yesterday I got the legs cut, drilled and sanded. and today I laied the first coat of sealer and stain.


started work on the top material as well.

and the back cover gets a coat of stain and sealer as well.


click my signature and it will take you there........

 
Posted : 22/09/2010 11:47 pm
timber715
(@timber715)
Posts: 5424
Member
Topic starter
 

Re: Pop up Cabinet build...

then, preparing the cover for the top opening, I resawed the stock I had prepared for it.

bookmatched cut the call it.


click my signature and it will take you there........

 
Posted : 22/09/2010 11:47 pm
timber715
(@timber715)
Posts: 5424
Member
Topic starter
 

Re: Pop up Cabinet build...

got it cleaned and milled to size.

handplaneded the sides and started the glue-up.

added several clamps just to make sure of even pressure.

the glue squeeze out is left to partially dry and is cleaned with a chisel and a cabinet scraper.

waiting for the glue to dry, it will be cut to size soon.


click my signature and it will take you there........

 
Posted : 23/09/2010 2:06 pm
jarod
(@jarod)
Posts: 1222
Noble Member
 

Re: Pop up Cabinet build...

This shade I like so much! 8)

For more of the latest tools, deals and tips - click HERE

 
Posted : 23/09/2010 2:19 pm
timber715
(@timber715)
Posts: 5424
Member
Topic starter
 

Re: Pop up Cabinet build...

sanding sealer and stain lang yan bro... it will v get sanded pa. 😀


click my signature and it will take you there........

 
Posted : 23/09/2010 2:55 pm
(@ply-user)
Posts: 67
Trusted Member
 

Re: Pop up Cabinet build...

sanding sealer and stain lang yan bro... it will v get sanded pa. 😀

ganda nga ng shade nya. anong sanding sealer at stain ang gamit mo sir?

 
Posted : 23/09/2010 8:05 pm
timber715
(@timber715)
Posts: 5424
Member
Topic starter
 

Re: Pop up Cabinet build...

I use ACE oil based sanding sealer and ACE walnut stain...


click my signature and it will take you there........

 
Posted : 23/09/2010 9:22 pm
Page 2 / 4
Share: